
College Refurbishment, Oxford
Scaffolding around several wings of a red-brick Oxford college for refurbishment works, taken up to the gables and every chimney stack.
View project
Guildford town centre · Commercial
Scaffolding a new hotel as it went up in Guildford town centre, netted along the street and working alongside a crane in the courtyard.
The project
This new hotel was built on a corner site in Guildford town centre, behind site hoardings on two busy streets. The scaffold had to rise with the building, giving the trades access as the frame went up, while keeping the pavements and roads around the site safe.
We scaffolded the street elevations to above the rising frame, with debris netting to protect the pavements and roads below. At the rear, the scaffold runs around three sides of the courtyard, with lattice beams at first-floor level bridging the openings below, while a mobile crane lifted in the courtyard itself.
Lifts taken above the rising structure as the building went up.
Debris netting protecting the pavements and roads.
Scaffold on three sides of the rear courtyard.
Working next to a mobile crane lifting in the courtyard.
Gallery
More projects

Scaffolding around several wings of a red-brick Oxford college for refurbishment works, taken up to the gables and every chimney stack.
View project
A full-height scaffold on a tower block in Slough for window and new cladding works, with a construction hoist running up one side.
View project
A full-height scaffold around the brick tower of a church in Newbury, taken above the parapet for repointing works to the main tower.
View projectFree quote
Tell us about the site and the work. We will call to confirm the details, arrange a survey if one is needed, and send a clear written quotation.
Answer a few questions · about a minute
Prefer to talk? 0800 2086 905Privacy